Tonganoxie USD 464 Home Page
« July 2010 »
Sun Mon Tue Wed Thu Fri Sat
27
28
29
30
1
2
3
4
5
6
7
8
9
10
11
12
13
14
15
16
17
18
19
20
21
22
23
24
25
26
27
28
29
30
31
1
2
3
4
5
6
7

 

The TMS front driveway and parking area will be under construction beginning August 3rd through at least Sunday, August 15th. Please plan to utilize the East Street entrance to park and enter the Middle School building from the south side. Thank you for your patience with this situation.
Department Announcements
First Quarter Report
The Facilities and Grounds Department has concentrated on three main areas during the first quarter of the school year:
  • Health and Safety: Hand sanitizer foam dispensers have been installed in every classroom of the Elementary School. Hand sanitizer wipes have been put in each bus so drivers can wipe down the seats and railings after each trip. The wood chips were replaced with pea gravel on the TES playgrounds. Security lighting and new wiring has been installed in the Bus Barn.
  • Environmental / Efficiency:  Recycled ground rubber chips, paid for by an environmental grant, were installed at the TES playground. The Trane system software was installed on a computer at the Central Office, and training has begun on operating the system. It is now possible to control the district's heating and cooling system in any building, make repairs to equipment, and conduct resets all remotely from this computer.
  • Grounds: Trees throughout the district have been trimmed to eliminate unsightly and dangerous dead areas. Parking lots throughout the district have been resurfaced. District flower beds were redesigned in order to decrease the need for maintenance.
Department Contacts
+ Easter, Larry
Click on name to see details.